208V is part (two hot wires) of a three phase grounded wye system. 110V or 220V operating voltage are typically meant for single phase system with a grounded neutral. I would do the following: 1.In the USA, do not use 208V single phase. Instead use 110V switch on your P/S and use 120V from L-N of a 208V/120V system. 2. Do not use 220V switch in
I see equipment specified all the time that is either 208/230V single phase or 208/230V three phase. The way I understand it (which obviously isn't completely correct) is that a 3-Phase 208 Volt panel will have 3 bus bars, each alternating from +120V to -120V and back 60 times a second (in the US). The alternating current is staggered such that For instance the Oroville Dam has 600 feet of head (water pressure). Flowing 1000 cubic feet per second of water, it can make a lot of power. To make that same power, a Mississippi River dam (with only 20 feet of head) has to drop 30,000 CFS. So your 560 watt pump can happen either at. 2.33 amps at 240V; 4.7 amps at 120V; 47 amps at 12V; Why The EUROPEAN 230V (50Hz) supply consists of 3 wires like the US. 1-hot, 1-neutral, and 1-safety ground. 230V (50Hz) is obtained between the hot and neutral lead. Double-pole main circuit breaker protects both the hot and the neutral leads. *See note below: Main breaker protects both hot leads. Triple-pole breaker may be used to also protect RcQbEB.